Financing Developments When Senior Debt Isn’t Enough

Standard development finance (e.g. senior debt secured against a scheme) suits most straightforward builds. But senior debt has hard structural limits, and property development is hardly ever ‘straightforward’.
James Mole·21 May 2026·9 min read

High land costs, phased delivery, commercial components, timed acquisitions, or equity stretched across several schemes all open gaps that standard lending can’t fill, even when the deal makes perfect sense on paper.

Before abandoning the deal, look at what the rest of the capital stack can do.

For experienced developers, the main options when senior debt alone isn’t enough are mezzanine finance, development exit finance, joint venture structures, and VAT bridging.

property development plans

The Limits of Senior Debt

Any capital stack discussion starts with where senior debt stops.

Lenders in the specialist development market work to two metrics: Loan-to-GDV (LTGDV) and Loan-to-Cost (LTC).

  • High street and government-backed lenders typically operate at 50 to 60% LTGDV.
  • Established challenger and alternative lenders extend to around 65%, with LTC running 80 to 90%.
  • Specialist lenders can reach 70% LTGDV in the right circumstances. The lender will always apply whichever ratio is more restrictive.

Take a scheme with a £1.5m total cost and a £2.2m GDV:

Mezzanine Finance

Mezzanine finance sits between senior debt and the developer’s equity in the capital stack.

It’s a second-charge loan, subordinate to the senior lender and repaid after senior debt if there’s a default. That’s why it carries a higher rate and is usually restricted to experienced developers with a track record of delivery.

In practice, mezzanine reduces the equity needed to get a scheme off the ground. Where senior debt covers 65% LTGDV and a developer has 10 to 15% equity available, mezzanine can fill the remaining gap, pushing total debt coverage to 80 to 85% of GDV in some structures.

What it costs

Mezzanine rates are materially higher than senior debt: typically 12 to 18% per annum, against 7.5 to 11% per annum on senior facilities. That cost compounds over the build, so it has to be modelled carefully against the return on the equity it replaces.

The aim here is a structure that works for your deal, where the cost of the finance is lower than the cost of missing the scheme or diluting equity to bring in a JV partner. The cheapest rate comes second.

When it applies

  • The developer has a viable scheme but insufficient equity to meet senior debt LTC/LTGDV requirements
  • Equity is committed to other live schemes and freeing it would disrupt existing programmes
  • The deal is time-sensitive and raising additional equity would cause delay
  • Returns at the mezzanine blended rate still justify the project on a risk-adjusted basis

Structuring note

If a mezzanine layer is likely to be needed, identify it during initial structuring.

Senior lenders have to consent to a second charge. Approaching a mezzanine lender after senior terms are agreed, or worse, after drawdown has begun, narrows your options and raises the cost. These decisions get locked in during the development finance process from application to drawdown.

MetricFigure
Total project cost£1.5m (land £500k, build £900k, fees £100k)
GDV£2.2m
65% LTGDV (challenger tier)£1.43m maximum facility
80% LTC cap£1.2m maximum facility (lender uses the lower)
Equity required£300k minimum, plus contingency and fees

On this scheme, a developer with £200k in equity has a problem.

The deal may well make sense. What matters is whether the capital gap can be filled, at what cost, and whether the returns still justify the structure. Lenders weigh more than the headline number, and development finance rates are only part of that calculation.

“Can the capital gap be filled, at what cost, and do the returns still justify the structure?”

Joint Venture Finance

Joint venture finance works differently from debt. Mezzanine and senior lending are loans with a defined repayment structure. A JV brings in a partner, typically a private investor or fund, who contributes equity in exchange for a share of the development profit.

With the right structure, a JV can cut the developer’s cash requirement to near zero. The developer brings the scheme: the site, planning, team, and delivery capability. The investor brings the capital. Profit is shared on pre-agreed terms once debt is repaid.

The trade-off

JV structures reduce financial risk for the developer but dilute returns. A 50/50 profit share on a £400k development profit leaves £200k to the developer instead of £400k. It also means the developer didn’t need to find £300k in equity to make the scheme viable.

Measure return on equity deployed. A developer running three JV schemes at once with minimal equity in each will typically outperform a developer running one scheme with all their equity in it, even if the per-scheme profit is lower.

When it applies

  • Developer has a strong site and planning but limited equity. E.g. the deal is fundable but the developer can’t fund it alone
  • Developer is scaling and wants to run concurrent schemes without tying all capital to a single project
  • A complex or higher-risk scheme (such as mixed-use development) benefits from an experienced capital partner alongside the lender
  • Developer is earlier in their track record and needs a capital partner to reach leverage their own application wouldn’t achieve

JV structures need careful legal drafting. Profit share mechanisms, decision rights, step-in provisions, and exit routes all have to be agreed up front. On the legal side of development finance, the structuring done before a deal is agreed decides the outcome long after the build is complete.

On JV sourcing

Matching developers with the right capital partner is as much about relationships as money. Investors have preferences on geography, asset class, developer experience, and return profile. Going to market without knowing that fit wastes time on both sides.

At Fundingwise we work with a network of established JV capital providers. Our debt advisory service covers the full capital stack, including JV introductions where the structure calls for one.

housing development plans

Development Exit Finance

Development exit finance is now a regular tool, and its use has grown as sales timelines have become harder to forecast.

The product is simple. It’s a bridging loan drawn at or near completion to repay the development facility. That gives the developer a longer window (typically six to eighteen months) to sell units when the market suits, instead of selling under the pressure of an expiring development loan.

What changes at completion

Development facilities are priced for the construction period, and the rate reflects the risk the lender took on. Once a scheme reaches practical completion, that risk changes materially. The build risk is gone and the debt is secured against finished stock. The development facility doesn’t re-price to reflect that, so you keep paying development finance rates on a completed asset.

Exit finance replaces it with a lower-rate facility sized against the value of completed stock. It also removes the time pressure that forces discounted sales. Selling at 5 to 7% below achievable values to hit a facility deadline often costs more than the interest on a development exit bridge.

Reading UK property market cycles feeds into this decision. Whether a short hold will produce a materially better outcome depends on where the market is heading.

When it applies

  • Build programme has overrun and the sales period needs more time than the original facility allows
  • Sales are progressing but at a pace that doesn’t match the facility expiry date
  • Market conditions shifted during the build and a short hold gives a materially better outcome
  • The scheme is being partially retained for rental income, requiring time to season before term refinance

VAT Bridging Finance

Commercial property is VAT-exempt by default, but sellers can elect to charge VAT. If they do, you pay VAT at 20% on the purchase price at completion. On a £1m acquisition, that’s £200k due on day one.

The VAT is recoverable from HMRC, but the reclaim often takes three to four months.

For developers with tight equity, £200k sitting in an HMRC queue instead of funding the build can disrupt the whole project cashflow. It’s one of several scenarios in our guide to specialist bridging and development finance for SME developers.

A VAT bridging loan covers the liability at acquisition and is repaid when the reclaim lands.

How VAT bridging works

The facility is sized against the VAT liability, drawn at completion, and repaid when the HMRC reclaim lands. Interest accrues on the outstanding balance over a typical three to six month term.

Over that period the cost is a fraction of what a disrupted cashflow would cost in programme delays or emergency borrowing against other assets. The cost of a VAT bridge depends mainly on how long the reclaim takes. Our guide on how bridging finance compares to other short-term funding options has more.

When it applies

  • Acquisition of commercial property or land where the seller has opted to tax
  • New commercial buildings less than three years old, which are standard-rated regardless of any option to tax
  • Any transaction where VAT is due upfront and the reclaim timeline creates a cashflow gap

If an acquisition qualifies as a Transfer of Going Concern (TOGC), no VAT is charged on the sale, so there is usually nothing to bridge.

The TOGC rules are specific and HMRC does not give advance assurance on whether a transaction qualifies. Take VAT advice before exchange on any commercial acquisition where TOGC treatment might apply.

How the Right Structure Gets Decided

The products above are tools. Which one, or which combination, fits depends on the constraints of your scheme.

In practice, the decision follows the shape of the problem:

If the problem is...The tool is likely...
Equity shortfall against senior debt requirementsMezzanine finance or JV equity, depending on return dilution tolerance
Build complete, sales slower than programmeDevelopment exit finance to repay senior debt and buy time
No equity to deploy but a strong site and planningJV structure: the developer contributes the deal, the investor contributes the capital
Commercial acquisition with VAT due on completionVAT bridging loan to cover reclaim period
Multiple constraints at once (e.g. equity gap + commercial acquisition)Structured combination: senior + mezzanine + VAT bridge, coordinated as a single package

That’s a simplified view, but it shows how specialist finance gets round the usual hurdles.

A structure only works if you can get it funded, so read it alongside how to secure development finance when lenders tighten criteria.

Final Thoughts

With specialist finance structures, the hard part is spotting which one fits your scheme early enough to appraise it properly and approach the right lenders on the right terms.

A scheme that needs mezzanine to work has to carry the mezzanine cost in its numbers from day one. A JV negotiated after planning is granted is negotiated on the investor’s terms. If you’re earlier in the process, our guide to understanding property development finance in 2026 covers the full picture from appraisal onwards.

We work with developers from the appraisal stage onwards. If your scheme has a capital stack question (an equity shortfall, commercial VAT, a JV to structure, or an exit to plan), the earlier we talk, the more options you have.

Want To Talk About Your Deal?

If your scheme has a capital stack question, book a free consultation and we’ll look at how to structure it before it becomes a problem.

We work with developers and investors across the UK in these situations every day. The conversation is free.

Book a free consultation | Call us: 020 4571 6186

James Mole
Director, Fundingwise
Real estate debt advisor with over a decade across finance and insurance markets. Certified in real estate financial modelling. Risk analysis, credit positioning and stress-testing appraisals, so delivery risks surface before underwriting.

Got a scheme to fund?

Send the site, the numbers and the programme. We will tell you whether it is fundable and what to fix first.
Talk it through

Property finance, in your inbox

Property finance insights from the Fundingwise team.

We'll email you a link to confirm. See our privacy policy for how we use your details.

Specialist property finance for developers who want the numbers to survive underwriting.
020 4571 6186LinkedIn
What we arrange
Company
Fundingwise Limited is not authorised or regulated by the Financial Conduct Authority, and arranges unregulated finance only. That means lending secured against commercial property, or against residential property that is not, and will not be, occupied by the borrower or an immediate family member as a main residence. We do not advise on or arrange regulated mortgage contracts or regulated bridging loans. Because this finance is unregulated, FCA conduct rules and access to the Financial Ombudsman Service do not apply. Fundingwise Limited is registered in England and Wales, company number 13750788.