A part-built scheme is a harder credit than either a bare site or a finished building. The security is a partly complete structure with no independent value, the cost to complete is uncertain until someone measures it, and the incoming lender inherits whatever the outgoing one was unhappy about.
How far through the build you are changes the product entirely. A scheme that is wind and watertight, structurally 80% or more complete, roofed and at first fix or beyond, reaches finish and exit finance at sensible pricing. A scheme with foundations and a steel frame does not, and needs a development lender willing to take the whole remaining programme.
Pricing reflects that. Rescue facilities are priced case by case, because no two have the same shape. Leverage is usually up to 70% of current value or 65% of end value, whichever is lower, and the story matters as much as the numbers.
An independent cost to complete
A quantity surveyor's measure of what is left, in place of the previous contractor's estimate. The whole facility is sized on it, and an independent figure is the fastest way to make the case credible.
The reason the last facility stopped
A main contractor insolvency, a cost overrun and a dispute are different risks. The lender will find out which one stopped yours, so tell them first.
Speed weighed against price
In a rescue another month usually costs more than the difference between a good rate and an excellent one, so we put speed ahead of the headline rate.
Title, retentions and the contractor position
Unpaid subcontractors, retention, materials on site and any charge or notice already registered all have to be resolved before a new facility can draw. That work usually sets the timetable.