Holding a site through determination, and funding the period in which consent creates the uplift.
Send us the deal
or call 020 4571 6186
Planning drawings for a residential development
Land without full consent cannot be development financed, and outline consent is not enough. Until full consent there is no costed scheme to lend against and no build programme to structure drawdowns around. The site is worth what it is worth today, as land.
Yet a successful application often creates the largest single gain in the project, before a brick is laid. Funding that period is a different product. The lender takes a view on the planning outcome and its timing.
Timing is the usual problem. A committee date that slips a cycle, a consultee objection, or a section 106 negotiation that runs long will each push the refinance past a term that was set optimistically.
Cost the hold through determination, including the slipped committee.
A term matched to the determination timetable, with slack
We size the term on the planning programme as it is likely to run, slipped committee included. Buying the same time later, through an extension negotiated under pressure, costs more.
Conditions identified early
Pre-commencement conditions stand between a consent and a development facility. We work out which ones a lender will care about at application stage, while they are still cheap to deal with.
Valued as land
A valuer will be conservative about hope value, and a lender more so. We size the day one advance on current land value, typically 50 to 60% until full consent, and leave out the value the consent is expected to create.
Section 106 and CIL in the appraisal
Affordable provision, contributions and levy are scheme costs that arrive with the consent, so the appraisal has to work after them.
Which lenders play here
Bridging lenders that will lend on land, a much smaller group than the number who say they will. Most decline a site without consent outright.
50-60%
LTV of land, current value
9-15m
Typical term, planning-led
Land value
What day one is sized on
Full
Consent needed for dev finance
Indicative, and not an offer. What a lender offers depends on the scheme, the borrower and a full valuation.
What to have ready

Bring these and we can tell you where you stand.

A lender will ask for each one. Have them early and the answer comes faster.
✓The site, what you paid or will pay, and the current planning status
✓Your scheme and the GDV you believe consent would support
✓The planning consultant's view on prospects and timetable
✓Known constraints: highways, ecology, flood, heritage, access
✓Likely section 106 and CIL exposure, even as a range
✓Your exit: development finance on full consent, or a sale of the consented site
Related

Worth reading on this

Next

Related in this pillar.

Common questions

The questions this product raises.

Can I borrow against land without planning permission?
Yes, with a land bridge. Development finance needs full consent, and outline is not enough. Until then the loan is sized on the land's current value, typically 50 to 60%. Fewer lenders do this than say they do.
What is the exit from a land loan?
Usually the development finance. Once full consent is granted, the development lender's day one advance against the land has to repay the land loan, so the land loan can only be as large as that refinance will clear. Pre-commencement conditions have to be dealt with before the development lender will draw, and section 106 and CIL have to fit the appraisal. The other exit is selling the consented site.
What happens if planning permission is refused?
The exit changes. You can appeal, resubmit a revised scheme, or sell the site as it stands, and each takes time the term may not have. The lender is relying on the land value covering its loan without a consent, which is why the advance is held to around 50 to 60%. Know your fallback before you borrow.
How long a term do I need for a planning bridge?
Typically 9 to 15 months, longer than the planning timetable suggests. Set it on how determination is likely to run, with room for a committee that slips a cycle.

Bring us the detail.

Send what you have. We will tell you what is fundable and what needs work before anyone approaches a lender.
Send us the deal

Property finance, in your inbox

Property finance insights from the Fundingwise team.

We'll email you a link to confirm. See our privacy policy for how we use your details.

Specialist property finance for developers who want the numbers to survive underwriting.
020 4571 6186LinkedIn
What we arrange
Company
Fundingwise Limited is not authorised or regulated by the Financial Conduct Authority, and arranges unregulated finance only. That means lending secured against commercial property, or against residential property that is not, and will not be, occupied by the borrower or an immediate family member as a main residence. We do not advise on or arrange regulated mortgage contracts or regulated bridging loans. Because this finance is unregulated, FCA conduct rules and access to the Financial Ombudsman Service do not apply. Fundingwise Limited is registered in England and Wales, company number 13750788.
Structured · Managed · Delivered
© Copyright Fundingwise 2026