Plans are never that simple. One thing we’ve found rarely gets considered is what happens if the relationship between developer and lender breaks down mid-build.
We don’t mean a dramatic blow-up. Just a gradual deterioration in communication, a shift in the lender’s risk appetite, or a programme delay that pushes the project outside the original loan term.
At that point the project may start to look unviable, but you’re too far in to abandon it. So what do you do?
It happens all the time. The answer is to start looking at whether refinancing the scheme mid-build is an option.
First, where mid-build refinance (also known as Step in development finance) sits next to two adjacent products.
Finish and exit finance applies once a scheme is wind and watertight: structurally 80% or more complete, roofed, typically at first fix or beyond.
Development exit applies after practical completion, replacing development debt with something cheaper while you sell.
Mid-build refinance sits earlier than both. Substantial structural work is still outstanding. This is development risk in the fullest sense, and lenders treat it that way.
Development lenders generally want control from the first spade in the ground. Their underwriting, monitoring relationships and drawdown schedules are built around overseeing a project from inception. Inheriting someone else’s half-finished build means inheriting risk they had no part in shaping.
Bridging lenders have the opposite problem. Their model assumes an ascertainable value against an existing asset, and a scheme with substantial structural work outstanding doesn’t have one.
The result is a narrow panel. A lender taking on a part-built scheme is underwriting a different risk profile, and knowing what they need to see usually decides whether a refinance completes in three weeks or three months.
Incoming lenders advance against where the scheme is today. That valuation is based on the work carried out to date, verified by an independent monitoring surveyor. GDV is not the basis for the new facility.
The lender needs to know whether the original cost plan still holds, or whether overruns have eaten the contingency. If costs have drifted materially from the original schedule, explain it clearly and support it with an updated QS report. For more on how drawdown schedules are structured, see our guide to the development finance process.
The incoming lender will want to confirm the main contract is properly executed and that collateral warranties are in place from key subcontractors and consultants. Those documents must allow assignment. Gaps in the security package slow the legal process and in some cases prevent the refinance completing at all. For a full breakdown of the legal requirements in development finance, see our development finance legal process guide.
Key documents to have ready:
The monitoring surveyor reports show the incoming lender the build stage, how the project has been managed, and how the remaining programme has been assessed. A clean IMS history speeds up credit approval considerably.
A well-documented mid-build refinance with everything ready can complete in three to four weeks. One where documents have to be chased and recreated takes longer, and time is usually what you’re short of.

The terms of a mid-build refinance reflect the extra complexity.
The new lender is pricing in completion risk on a scheme already partway through delivery. They are also pricing in the cost of taking over security from the outgoing lender, which needs two sets of solicitors and re-registration of charges. The borrower pays those legal costs. For current context on how lenders price development risk, see our overview of development finance rates.
Establish the redemption position with the outgoing lender early, and in writing. Some development facilities carry early redemption charges. Others have accrued interest and monitoring fees added to the redemption figure, which the new facility has to be sized to cover. A redemption figure that moves between instruction and completion creates problems that are difficult to resolve at short notice.
The instinct is often to push the incoming lender for a lower margin. That is sometimes possible, particularly where the original facility was arranged when the market was tighter. Mid-build, though, the speed and certainty of the refinance usually matter more than a 0.1% improvement in rate. A four-week delay caused by a lender who can’t move fast enough will cost more than the margin difference saves.
Rates typically sit at 10.5% per annum and above, assessed case by case. There is no rate card for this product because there is no standard deal.
Don’t take on a mid-build refinance lightly. It’s costly, stressful, and slow.
But if you wait until the existing lender has issued a formal default notice, or the loan term has already expired, your negotiating position is weaker and the timeline is compressed. That’s when things start to break down.
Start looking at refinancing as soon as the relationship with the existing lender starts to feel difficult. That might be six months before the loan term expires. It might be earlier if drawdown releases are being held up or extension conversations are stalling. Even if you never go through with it, having the option lined up could save the scheme.
Come to market with time in hand, updated cost reports, a current IMS summary and a clear redemption figure, and you have options.
For an example of a mid-build refinance that rescued a project, see our £2.8m strategic refinancing case study.
Not every lender will take on a part-built scheme. Many who say at enquiry that they can find their credit appetite doesn’t survive committee, sometimes after a valuation and monitoring surveyor report have already been instructed and paid for. That time and money is gone.
The panel that does mid-build refinance is smaller than the wider development finance market, and finding the right fit takes market knowledge a comparison table won’t give you.
See our article when to use a specialist development finance broker.
That’s what we do at Fundingwise. We know which lenders will move at the speed your timeline needs, which have appetite for your asset type and location, and how to structure the approach for a clean, fast completion.
If your development facility is creating more friction than it resolves, talk to us before it becomes urgent. We’ll tell you what’s available and whether a refinance makes commercial sense at this stage.
Book a free consultation or call us on 020 4571 6186
Property finance insights from the Fundingwise team.
We'll email you a link to confirm. See our privacy policy for how we use your details.