Lenders don’t see it that way. For them, the legal stage is where they confirm that the deal in front of them is the deal they agreed to fund, and that the security they’re taking is solid enough to lend against.

You’ve been through initial underwriting. The lender has reviewed your appraisal, assessed the site, looked at your track record, and issued credit-backed terms.
That matters. It means the deal works in principle.
But the term sheet does not confirm that funding is secured.
It confirms the lender is willing to proceed, subject to valuation, monitoring surveyor sign-off and legal due diligence all coming back clean. Any one of those three can change the terms, reduce the loan, or stop the deal altogether.
“The legal stage is where we most commonly see deals in principle come unstuck. But it shouldn’t be. The questions are predictable. The delays are almost always avoidable.”
Before the legal stage itself, here is the full process. For a broader walkthrough, our guide to the development finance process covers each stage in detail.
Legal doesn’t happen in isolation. It runs alongside valuation and the QS appointment, and its outcome decides whether drawdown can go ahead.
| # | Stage | What happens |
|---|---|---|
| 01 | KYC & Initial Underwriting | Lender assesses borrower identity, credit history, financial position, and development CV. This runs in parallel with project underwriting: who you are, and whether your project stacks up. |
| 02 | Project Underwriting | Lender scrutinises the development appraisal, GDV assumptions, build costs, contingency, and exit strategy. Deals with weak numbers or unconvincing exits are re-priced or declined here. |
| 03 | Credit-Backed Terms Issued | A formal term sheet is issued. Most developers exhale here. They shouldn't, because this is where most of the process starts. |
| 04 | Valuation | Lender appoints a panel valuer to assess the site value and GDV. Valuations are almost always conservative. If your appraisal was built on optimistic GDV assumptions, the gap surfaces here. |
| 05 | Monitoring Surveyor Report | An independent QS is appointed by the lender to assess build costs and programme. They report to the lender, and their job is to manage the lender’s risk. |
| 06 | Solicitors Instructed | Two sets of solicitors: lender's and borrower's. Title investigation, search results, facility agreement, and security documentation are all progressed simultaneously. This stage typically takes 4 to 8 weeks. |
| 07 | Conditions Precedent Satisfied | A checklist of requirements must be met before funds can be released: insurance in place, planning conditions checked, title clear, building contract signed. Missing items hold up drawdown. |
| 08 | Drawdown & Build | Funds released in staged tranches against QS-approved build milestones. Each drawdown requires a QS sign-off. Delays in reaching milestones delay the next tranche. |
| 09 | Practical Completion | Build is complete. That is different from lender completion. Retentions may remain, final QS sign-off is required, and any outstanding conditions precedent must be cleared. |
| 10 | Exit | Loan repaid via sale, refinance, or phased exit for multi-unit schemes. Exit strategy agreed with lender at outset; changes to this mid-deal require lender consent. |
The table is simplified. In practice stages 4, 5 and 6 often run at the same time, so a delay in one puts pressure on the others.
If legal takes longer than expected, the monitoring surveyor may be ready before funds can be released. If valuation comes in late or low, the legal team has to work with revised loan figures.
Once solicitors are instructed, two processes run in parallel.
The lender’s solicitor reviews the title to the property being used as security. You can check the registered title yourself via HM Land Registry, and it’s worth doing before any lender is engaged.
They’re looking for anything that might impair the lender’s ability to enforce its charge, or impair the development itself.
Common issues at this stage:
None of these is necessarily a deal-breaker. But each one generates enquiries, needs responses and takes time. If a title issue surfaces mid-legal that nobody spotted before lenders were engaged, you’re resolving it under time pressure, with costs mounting.
The facility agreement sets out the full terms of the loan, drawdown conditions, reporting requirements, default provisions, and the lender’s step-in rights.
The security package typically includes a first legal charge over the property, a debenture over the SPV (see below), and personal guarantees from directors.
The lender’s solicitor drafts this documentation. Your solicitor reviews it, negotiates where possible, and makes sure you understand what you’re signing.
Directors giving personal guarantees usually have to take independent legal advice, which means appointing a separate solicitor for that purpose.
Most lenders require development finance to be drawn into a Special Purpose Vehicle, a company set up for the project. If the borrowing isn’t already structured through an SPV, that has to be resolved before legal can progress.
You can incorporate an SPV quickly via Companies House, but agree the structure with your lender first.
For the lender the reasoning is simple: a clean SPV with no trading history, no existing charges and no exposure to other projects is a simpler, safer security position.
For the developer it also limits liability. If something goes wrong on one scheme, it doesn’t automatically expose other assets.
Note: If mezzanine finance or a second charge is involved, an intercreditor deed will be required, a separate legal agreement between the senior and junior lenders establishing the order in which each is repaid. This adds a layer of complexity and, typically, additional time. For a broader look at how development finance is structured for SME developers, see our article on specialist development finance for SME developers.
The SPV needs to be in place and agreed with the lender before legal starts in earnest. Leaving the decision until after terms are issued wastes time and can mean renegotiating.

A well-prepared deal with the right solicitor can complete legal in three to four weeks. Most take longer.
The common causes:
“The deals that move through legal efficiently are the ones where the answers were ready before the questions were asked. Knowing when to engage a specialist broker, and doing so early enough, is a significant part of that.”
Title issues, planning conditions, SPV structuring decisions and insurance requirements all exist before a solicitor is instructed. The legal stage brings them to light.
It tends to do so at the worst moment, when money is on the line and timelines are tight.
At Fundingwise, we stay involved from the first conversation to the final drawdown. We know what lenders’ solicitors look for and where deals stall, and we can often spot issues before they become formal queries.
So we make sure the SPV is structured correctly before legal starts, planning conditions are in order, insurance requirements are understood, and your legal team has what it needs before they pick up the phone.
If the legal stage comes as a surprise, the groundwork wasn’t laid, and that problem started long before solicitors were instructed.
If you’re approaching a development finance application and want to know where your deal is likely to face scrutiny, give us a call. A 30-minute conversation at the right point can save you weeks of delay and significant cost later on.
Call us on 020 4571 6186 or send us the scheme
Property finance insights from the Fundingwise team.