The same facility does both. Mezzanine finance sits behind the senior lender and in front of your equity, closing the gap between what the bank will lend and what the project costs, so less of your own money goes in.
Below: how mezzanine works in a development capital stack, when it makes sense against the alternatives, and what securing it involves.
A development finance facility has layers. That brings complications, and a lot of flexibility. Most projects have funding in three layers, each with a different cost, risk profile and priority on repayment:
This is the first-charge loan from the primary development lender. It’s the cheapest money in the stack. Most senior lenders advance up to 65% of GDV (or 80% of total costs, whichever produces the lower number). The senior lender is repaid first on exit, either from sales proceeds or refinance.
See our guide to residential development finance for a full breakdown of how senior facilities are structured.
This sits behind the senior debt as a second charge. It’s more expensive because the lender is in a subordinated position. If the senior lender enforces and the recovery falls short, mezzanine absorbs the losses first. The higher rate pays for that.
The final layer is what remains after debt. On a scheme without mezzanine, this is typically 20 to 35% of total costs. With mezzanine, it can often come down to 10 to 15%.
The table below shows how this works on a typical scheme:
| Without mezzanine | With mezzanine | |
|---|---|---|
| GDV | £4,000,000 | £4,000,000 |
| Total project costs | £3,000,000 | £3,000,000 |
| Senior debt (80% LTC) | £2,400,000 | £2,400,000 |
| Mezzanine (to 90% LTC) | None | £300,000 |
| Developer equity | £600,000 (20%) | £300,000 (10%) |
| Mezzanine all-in cost (25%) | None | £75,000 |
| Projected profit | £1,000,000 | £925,000 |
| Return on equity | 167% | 308% |
Return on equity nearly doubles. The mezzanine costs £75,000, taken here at the top of the 18 to 25% all-in range covered below, but the smaller profit is divided by half the equity. That is the core argument for mezzanine on profitable schemes: it amplifies returns on the capital you put in.
Mezzanine can sound like a cheat code for maximising leverage. It doesn’t suit every equity gap.
The decision is a comparison against two alternatives: stretched senior and a JV equity partner.
| Option | Leverage | Cost | Complexity | Best suited to |
|---|---|---|---|---|
| Senior only | 60 to 70% LTGDV | Lowest | Simple | Developers with sufficient equity |
| Stretched senior | 70 to 75% LTGDV | Medium | Simple | Higher leverage, one facility, one lender |
| Senior + mezzanine | 80 to 85% LTGDV | Higher | Complex | Maximum leverage; 3+ scheme track record required |
| Equity partner / JV | Up to 100% costs | Highest | Complex | Minimal equity; partner takes profit share |
If you can get it, stretched senior with a single lender is often cleaner and cheaper at moderate leverage. One facility, one set of legal documents, no inter-creditor agreement.
Mezzanine starts to make sense when you need to push to 80 to 85% LTGDV, or can’t find a lender who will stretch.
Beyond that, a JV equity partner is usually the only route.
Not everyone qualifies. Mezzanine lenders require a minimum of three completed development schemes, and for most lenders in the market that is a hard underwriting filter.
The reason is the risk profile. The mezzanine lender sits in second-loss position. If the project fails and the senior lender enforces, mezzanine recovers only what’s left after senior debt is repaid in full. In a distress scenario that may be nothing. The lender’s protection against that outcome is confidence in the developer’s ability to deliver.
Developers who don’t meet the threshold will have to look at either stretched senior or a joint venture partner.
See our guide to financing developments when senior debt isn’t enough for more on both routes.
Senior debt is agreed first. Mezzanine is then sized against the gap that remains after the senior facility and the developer’s equity contribution are confirmed.
Senior lender consent.
The mezzanine lender takes a second charge on the site. The senior lender must consent to that second charge before mezzanine can draw. Most senior lenders familiar with mezzanine structures have no objection, but flag it at heads of terms. Raising it at drawdown is a common source of delay.
Valuation.
Mezzanine lenders typically rely on the senior lender’s RICS valuation instead of commissioning their own. You pay the valuer a reliance fee, which saves time and cost against a full second valuation.
Drawdown structure.
Mezzanine is usually drawn in full on day one alongside the senior facility. Some lenders draw it in two tranches, an initial advance at the start and a second at a defined milestone, but a single day-one draw is more common.
Repayment.
Interest rolls up alongside the senior facility and is repaid on exit from sale proceeds or refinance. No monthly payments during the build. The rolled interest forms part of the mezzanine lender’s return alongside the arrangement and exit fees.

Finding a mezzanine lender for your deal is one of the trickiest parts. High street banks won’t engage, because the risk profile and pricing don’t suit their books. They’ll often allow a mezzanine lender to sit behind them but won’t write the second charge themselves. (Note that this needs an intercreditor/ deed of priority between the two lenders, which we cover below.)
The market breaks down roughly like this:
If you’re looking for mezzanine, your best bet is a broker or adviser like Fundingwise: someone who knows the pieces, has direct access to the relevant lenders, and knows which are most likely to lend on your deal.
The inter-creditor agreement (ICA) is the legal document that governs the relationship between the senior and mezzanine lenders. It sets out the enforcement order, standstill periods, cure rights, and the repayment waterfall if either facility defaults.
The ICA is where most mezzanine deals slow down. Both lenders need separate legal representation. If they haven’t worked together before, ICA negotiation can add four to six weeks and meaningful legal cost on top of the budget. If they already have a pre-agreed ICA, the timeline is much shorter.
Mezzanine rates in the current market sit at 12 to 18% per annum, reflecting the subordinated position. That is a wide range. Where you land depends on your experience, the margins on your scheme and your exit strategy.
Also budget for arrangement fees of 2 to 3% of the facility, exit fees of 1 to 2%, and separate legal costs for the mezzanine lender (borne by the borrower). On a 24-month development programme, the all-in cost of the mezzanine tranche on a money-multiple basis is typically in the range of 18 to 25%.
That cost is why thin-margin schemes don’t suit mezzanine. It shouldn’t put you off straight away, though.
Compare mezzanine with the cost of the capital you would otherwise put in: your own equity, or an equity partner’s return requirement.
If mezzanine lets you put in half the equity and run a second scheme at the same time, or take on a scheme you otherwise couldn’t, the higher ROI on a strong-margin scheme often more than covers the cost of the loan.
Related: What Matters More Than Rates in Development Finance?
Whether it’s making a scheme possible or freeing up capital for the next one, we arrange senior debt, mezzanine and stretched senior facilities for residential and mixed-use development across the UK.
If you’re weighing up the capital stack for an upcoming scheme, we’ll talk through what fits.
Book a free consultation or call us on 020 4571 6186
Property finance insights from the Fundingwise team.
We'll email you a link to confirm. See our privacy policy for how we use your details.