Used well, it secures sites, keeps momentum and fills gaps in a project’s financing. Used without the right preparation, it creates the delays and cost overruns it was meant to prevent.
When a bridging deal goes wrong, the reasons are usually visible well before anyone signs anything.

A bridging loan for property development is a secured, short-term facility, typically 6 to 24 months, used to fund one stage of a development project. It does not fund the whole thing.
This is a different product from a residential chain-break bridge, the kind that helps someone buy a new home before selling the old one. Development bridging sits in a different part of the market. It is assessed and structured differently, and lenders treat its borrowers as a category of their own.
The security is usually land or property. Most bridging lenders lend on a gross loan figure, typically on a 12-month term, meaning interest and fees are rolled in, and calculate leverage on that gross sum. The maximum for most lenders is 75% of the property’s value on a gross basis. Once interest is rolled in and fees are deducted, the net day-one advance to the borrower is typically 65 to 70% of value.
This causes confusion. Borrowers used to buy-to-let or standard mortgage lending expect close to the headline LTV on day one, and are surprised when the net advance falls well short. Some lenders present their figures clearly. Others set gross and net numbers side by side in ways that blur the difference. Structure the deal around what you will receive on day one, whatever the facility headline says.
Unlike a development finance facility, there are generally no staged drawdowns against a construction programme. The loan is drawn in full, or in agreed tranches based on milestones.
It depends on the project stage, the timeline and what comes next. Bridging is versatile, so if you want to know whether it suits your project, call us.
Some common use cases for development bridging:
Moving quickly on a site before planning is secured. Bridging provides the capital while the planning process runs, and speed often decides whether you get the site.
You’ve bought the land, planning is in progress, and full development finance isn’t yet appropriate. Bridging holds the position without locking you into a development facility prematurely.
The scheme is built, units are selling, but the development loan needs to be repaid before sales complete. A development exit bridge buys the time without forcing fire-sale pricing.
A conversion or refurbishment where the scope and timeline don’t justify a full development facility. Bridging covers the works and refinances on completion or sale.
Related: Understanding Specialist Bridging Development Finance for SME Developers
If your project involves significant ground-up construction, a build programme of more than 12 to 18 months, or loan-to-cost efficiency that only a staged drawdown facility can provide, use development finance. Bridging in these situations tends to cost more and fit the project worse.
The decision isn’t always obvious, and the wrong call on funding structure ripples through the whole appraisal. Getting independent advice before committing to a route is worth the time.
“The funding structure decision shapes everything that follows, cost, timeline, lender appetite, and the flexibility you have when things don’t go exactly to plan.”
Lenders assessing a bridging loan for property development are underwriting two things at once: the asset securing the loan, and the credibility of the exit. Of the two, the exit carries more weight than many borrowers expect.
A lender will want to understand the property or land being used as security, its current value, its planning position, and any title or environmental issues that might affect enforceability or saleability. They’ll instruct their own RICS valuation, and as we’ll come to, the relationship between a developer’s GDV assumptions and what a lender’s valuer will accept is one of the most consistent sources of friction in this market.
Beyond the security, lenders focus on:
Exit strategy.
How does this loan get repaid? Sale, refinance onto a development facility, or another clearly defined route? The more credible and specific the exit, the more comfortable a lender is with the loan.
Developer experience.
Commercial bridging lenders look at track record. Experience is often looked at as a proxy for deliverability. If you’re earlier in your development career, the quality of your advisers and the clarity of your plan carry more weight.
Planning position.
The planning status of a site materially affects both LTV and lender appetite. A site with full planning is a fundamentally different risk proposition to one where planning is speculative.
Loan structure and term.
Bridging lenders are short-term lenders. They want a realistic timeline. A well-structured loan with a credible 12-month timeline is a better conversation than an ambitious 6-month plan that’s unlikely to hold.
Preparation pays off in knowing what a specific lender needs to see, and presenting it the way they’re used to receiving it.
Before any lender approach, the Fundingwise team spends considerable time building the case around that lender’s assessment criteria.
Fundingwise works with SME developers across the UK, structuring debt for refurbishment, conversion, and ground-up residential schemes. Send us the scheme.

Bridging rates vary by lender, by deal profile, and by market conditions at the time of application. So here is a framework for thinking about bridging costs on a development project, in place of a rate table.
Developers sometimes treat bridging finance as a rate-shopping exercise. The instinct is understandable, but it tends to lead to the wrong decisions.
Ask instead: “does this deal work at a realistic cost of funds, and is my model stress-tested against a term that runs longer than planned?”
That tests whether the deal is viable, and it’s a modelling question before it’s a lender question.
Related: What Matters More Than Rates in Development Finance?
“If a bridging deal only stacks up at the best-case rate on the shortest possible term, the margin isn’t there. A well-structured deal should be able to absorb realistic financing costs and still make sense.”
Structure matters as much as pricing. How the loan is drawn, what flexibility exists around the repayment date, whether rolled interest compounds monthly or is calculated differently: these can move the all-in cost as much as the headline rate. Exit planning is part of the structure too.
The Fundingwise team works through all of this before any lender conversation starts, so the deal is structured to complete as well as to get approved.
For current indicative pricing, speak to the Fundingwise team.
The two products serve different purposes and suit different project stages. A working comparison, though the right answer for any project depends on context:
| Bridging Finance | Development Finance | |
|---|---|---|
| Typical use | Site acquisition, pre-planning, refurb, development exit | Ground-up construction, major conversion, staged build programmes |
| Loan term | 6 to 24 months | 12 to 36 months (build period + contingency) |
| Drawdown structure | Lump sum or agreed tranches based on milestones | Staged drawdowns against build progress, monitored by IMS |
| LTV / LTC | 75% gross / 65 to 70% net day-one advance (lender-dependent) | 80 to 90% LTC / 50 to 65% LTGDV (varies by lender tier and experience) |
| Monitoring surveyor | Not typically required | Required by most lenders throughout build |
| Speed of arrangement | Faster: typically 2 to 6 weeks on clean deals | Slower: typically 6 to 14 weeks from full application |
| Interest rate | 0.55 to 0.95% per month (market average c.0.69%) | 7.5 to 11%+ per annum (varies by lender tier) |
| Best suited when | Speed matters; project stage doesn't suit a full dev facility | Significant construction programme; staged capital requirement |
Some projects use both in sequence: a bridge to acquire and secure planning, then a development facility once the site is de-risked.
Design that layered structure as a whole from the outset, with both facilities in mind. Adding the second product after the first is in place is a harder conversation with lenders.
Most of the bridging deals we see that don’t complete, or complete late and over-cost, come down to a handful of recurring patterns. None of them are surprising in hindsight.
Lenders don’t lend against optimism. An exit that depends on a planning outcome that isn’t certain, a sale timeline that hasn’t been evidenced, or a refinance that hasn’t been pre-scoped will either fail at credit or come with terms that reflect the risk.
Make the exit specific and evidenced before the loan is structured around it.
Developers and lenders often see GDV differently. Developers are optimistic by necessity, because the whole proposition rests on upside. Lenders are conservative by design, because their job is to protect against downside. The RICS valuer a lender instructs will generally take a cautious view of comparable evidence, apply a discount for market risk, and produce a number that can be materially lower than the borrower’s own appraisal.
If your deal only works at your GDV number, it’s fragile. Stress-testing the GDV against a more conservative valuer’s view before approaching lenders is time well spent.
Bridging lenders differ. Each has specific appetites for asset type, geography, LTV, borrower profile and deal complexity. Approaching a lender whose book is full in a particular sector, or who doesn’t have appetite for development risk at a given LTV, wastes time a time-sensitive bridge deal doesn’t have.
Knowing which lenders are actively looking for your type of deal, beyond which ones offer the product, takes years in the market.
Bridging is supposed to be fast. The reason deals slow down mid-process is almost always incomplete information: title queries, gaps in planning documentation, missing corporate structure details, KYC that wasn’t prepared. Each query from a lender or their solicitor adds delay.
Preparing a complete, clean information pack before approaching a lender removes most of this risk.
Arrangement fees, exit fees, dual legal costs, valuation, and rolled-up interest add materially to the headline rate. A deal modelled on the interest rate alone, without the all-in cost of funds, can look profitable on paper and be marginal in practice.
Model the full cost, including a realistic contingency on term, before the deal is signed.
The Fundingwise team has over 40 years’ combined experience of development finance deals, the ones that completed cleanly and the ones that didn’t. That experience shapes how we approach every bridging instruction.
Before we approach any lender, we do the preparation work. That means building a full picture of the deal (the asset, the planning position, the exit, the borrower entity, the funding structure) and modelling it against what we know lenders in this market will and won’t accept. GDV assumptions get stress-tested. Exit strategies get scrutinised. Corporate structures get documented cleanly.
We choose lenders deliberately. We know which lenders are active in which parts of the market, what their current appetite is, and how they like to receive information. A well-matched, well-prepared approach moves through credit faster and with fewer queries than a general submission to several lenders who may not fit.
We stay involved throughout, across valuation, legals, and any lender queries, because that’s where momentum is lost if nobody is managing the process. Too many sound deals fall over because nobody was coordinating the moving parts.
Development bridging is a process as much as a product, and managing it as one changes how it ends.
Fundingwise works with SME developers across the UK, structuring debt for refurbishment, conversion, and ground-up residential schemes. Send us the scheme.
Property finance insights from the Fundingwise team.
We'll email you a link to confirm. See our privacy policy for how we use your details.