We use cookies to see how the site is used, and to work out which marketing brought you here. You can accept, reject, or choose. See our cookie policy.

A detached barn conversion of roughly 5,500 square feet on the edge of the Althorp Estate, five bedrooms and a one bedroom annex, with consent already in place for an indoor pool, sauna and steam room. The finished house is on the market at a guide price of £2m.
Most development lending only looks at the site
A standard development facility sizes off the scheme in front of it: the land, the build cost and the end value. That works when the site is the whole picture. Here, most of the borrower's balance sheet sat elsewhere. Sized on the barn alone, the day one money would have been thin and the client would have been funding the early works himself while holding equity he could not reach.
A conversion draws differently to a new build
Barn conversions front-load. Structural work, the roof, the frame, the glazing package all land early, and the valuer's uplift arrives later. A drawdown schedule shaped for a new build leaves the borrower cash-hungry in the months a conversion is most expensive.

We structured it as a hybrid bridge and development facility. The bridge element took security across the borrower's other assets, which is what generated the £265,000 on day one. The development element then funded the build through £632,000 of staged drawdowns across a 15-month term.
Because the day one money was not sized off the barn, it was not held back until the barn had value. It arrived when the borrower needed it, and the staged element worked as normal development finance from there.
To get a lender comfortable, we presented the asset base and the scheme as one position, so the security was underwritten together.
“If a borrower has assets, the site is not the only thing we can lend against. Sizing this one off the barn alone would have left him funding the first few months himself, and there was no reason for that.”
Matt Underhill, Fundingwise DirectorThe client started on site with £265,000 already drawn, and the build was funded through to completion without him putting the early works on his own cash.
Property finance insights from the Fundingwise team.
We'll email you a link to confirm. See our privacy policy for how we use your details.
