Bridging finance is short-term funding secured against property, typically used for auctions, chain breaks, refurbishments, or gap funding before longer-term finance completes. It’s fast, flexible, and more expensive than traditional mortgages or development loans.
Bridging finance varies, though. Its regulatory status (regulated or unregulated) determines cost, speed and flexibility.
It comes down to one question: will the borrower or a close family member live in the property being used as security?
Broadly, under regulated bridging the property is, or will be, occupied by the borrower or an immediate family member as their main residence. These loans fall under FCA regulation, so affordability assessments, a standard illustration of the loan's costs and terms before you commit, and consumer protection rules apply throughout.
The security is commercial or investment property: a development site, a buy-to-let, commercial premises. No FCA oversight applies. The assumption is that professional borrowers understand the risks and don’t need the same consumer protections.
As a property developer, you are almost always working in unregulated territory. Your security is a development site, a commercial asset or investment property, and the FCA framework doesn’t come into it. What matters is how unregulated status shapes the way deals are structured, assessed and executed.

The absence of FCA regulation has practical consequences. Most are positive for developers and property professionals, but there are trade-offs.
Without formal affordability assessments, standardised disclosure documents and cooling-off periods, unregulated lenders can move much faster.
Credit decisions are made on the deal (the asset, the exit, the borrower’s experience), outside a consumer lending framework built for a different kind of borrower. Completions in three to four weeks are achievable on clean deals; some complete faster.
Unregulated lenders set their own credit criteria and can use judgement on complex situations. A site with an unusual title, a borrower with an unconventional corporate structure, a deal that doesn’t fit a standard template: the unregulated market can assess these on their merits, where regulated lenders, bound by compliance frameworks, often can’t.
The unregulated market is much larger than the regulated one, with far more lenders active.
That means competition, more options for specific deal profiles, and lenders who specialise in development-related bridging.
The FCA framework exists to protect consumers. Lender quality varies widely, from well-capitalised, experienced specialists to less reputable operators, so knowing who you’re dealing with is part of managing the risk.
This is one of the areas where an experienced broker (like the Fundingwise team) can advise you.
According to Bridging Trends Q2 2025 data, the specialist bridging market shows:
The market still favours first-charge lending, and average LTVs remain conservative despite easing rates, which reflects lender caution about valuations in uncertain conditions. The c.54% average LTV is a reminder that headline LTV limits and the leverage lenders deploy are very different numbers.
“In unregulated bridging, lender selection and preparation are the primary risk controls available to the borrower.”
Most market commentary says little about public sector funding for SME developers. Where private bridging or development finance is unavailable, or expensive relative to the scheme’s margins, government-backed schemes can change the economics.
Home Building Fund
Development and infrastructure loans for SME housebuilders and custom builders, at rates typically below private lenders.
Homes England: Development Loans →
ENABLE Build
A £150m facility launched January 2025, delivered through a bank partner, targeting SME housebuilders with limited track records or marginal scheme viability.
British Business Bank: ENABLE Build →
Public sector schemes involve longer approval timelines and stricter criteria than private lenders. They won’t suit every project, and for time-sensitive deals they’re rarely the right primary route.
For viable schemes where the private market is expensive or hard to access, particularly for developers earlier in their career, the cost savings and lower equity requirement can decide whether a project goes ahead at all.
Watch the policy discussion about reclassifying Homes England as a dedicated public financing institution.
If it goes ahead, expanded lending capacity and more competitive terms could follow in future spending reviews.
Homes England’s current programmes are worth understanding now, whichever way that discussion goes.
SME developers often treat bridging and development finance as alternatives. In practice they serve different stages, and are sometimes used together in sequence.
| Unregulated Bridging | Development Finance | |
|---|---|---|
| Regulatory status | Unregulated; FCA does not apply | Unregulated |
| Primary use | Site acquisition, pre-planning hold, refurbishment, development exit | Ground-up construction and major conversion with staged build programme |
| Loan term | 6 to 24 months | 12 to 36 months |
| Drawdown | Lump sum or agreed tranches based on milestones | Staged against build progress, monitored by independent surveyor |
| Typical LTV / LTC | 75% gross / 65 to 70% net day-one advance (lender-dependent; rolled interest and fees reduce what the borrower receives on day one) | 80 to 90% LTC / 50 to 65% LTGDV (varies by lender tier and borrower experience) |
| Indicative rate | 0.55 to 0.95% per month (market average c.0.69%; above 0.95% typically reflects adverse, specialist, or high-risk profiles) | 7.5 to 11%+ per annum (high street/government-backed from 7.5%; challenger/alternative 8.5 to 9.5%; private/specialist 9.5%+) |
| Speed of arrangement | 2 to 6 weeks on clean deals | 6 to 14 weeks from full application |
| Public sector alternative | Limited; speed-dependent | Homes England, ENABLE Build for qualifying schemes |
Some projects use both in sequence: a bridge to buy a site and hold it through planning, then a development facility once planning risk is gone and the scheme is de-risked enough for a construction lender.
A layered structure like that has to be designed as a whole from the start. The bridge terms need to allow for the development finance timeline, and the development facility needs to work with the equity position set at the bridge stage.
Fundingwise structures these layered deals regularly and knows what each type of lender needs to see at its stage.

Most bridging deals that fail to complete, or complete late, follow recognisable patterns, and preparation avoids all of them.
1. Treating speed as a substitute for preparation
Unregulated bridging is faster than regulated lending because there are fewer mandatory process steps. Lenders are no less rigorous about deal quality.
Arrive without clean title information, a properly documented corporate structure or a credible exit plan, and the queries will slow you down. The developers who complete quickly prepared before they approached anyone.
2. A weak or vague exit strategy
Lenders underwrite the exit as carefully as the entry. An exit that depends on an uncertain planning outcome, a sale timeline with no supporting evidence, or a refinance nobody has checked against a lender’s criteria will either fail credit or attract terms that price in the uncertainty.
3. Overoptimistic GDV assumptions
We see this a lot. It is a constant source of friction across development lending. Developers appraise the upside; the lender’s valuer applies conservative numbers and a market risk discount.
If the deal only works at the developer’s optimistic GDV, the valuation report will break it.
4. Approaching lenders without understanding their appetite
The unregulated bridging market is broad, but its lenders are not interchangeable. Appetite varies by geography, asset type, LTV, deal size and borrower profile. Approaching a lender whose book is full in your sector, or whose criteria don’t fit your borrower structure, wastes time a bridging deal rarely has.
An experienced broker knows which lenders are looking for deals like yours right now.
5. Underestimating total cost of funds
Arrangement fees, exit fees, dual legal costs, valuation and rolled-up interest add up over the full term. If the term extends, so do the costs.
A deal modelled on the monthly rate alone, without the all-in cost over a realistic term, can look viable on paper and be marginal in practice.
Build the full cost into the appraisal before committing, with a contingency on term length.
Whether you’re weighing up a bridge for a site purchase, working out how bridging fits alongside development finance, or looking at whether a public sector scheme could work for your project, we’re happy to talk it through.
The Fundingwise team has over 40 years of combined experience in specialist development lending.
Send us the scheme and we’ll come back with your funding options.